Construction progress 13.07.17

2nd line

103/8 facade work completed by 95%; The installation of water supply and heating systems (apartments) is ongoing; at the present time, the work is done on 80%; Windows installed - 100%

103/9 the floor screed is ready for 100%, the windows are installed - 100%, the process of insulation of the parapet-roofing part has begun

103/10 (2) the readiness of the facade is 90%, the process continues

103/10 (3) work on the installation of the facade continues - readiness 98%

3rd line

103/11 (1) proceeded to the floor slab of the 6th floor

103/11 (2) started laying on the 6th floor

103/11 (3) finished the floor slab of the 5th floor

103/12 (1) proceeded to the floor slab of the 6th floor

103/13 (1) started laying on the 6th floor

103/13 (2) completed the laying on the 5th floor

103/14 are preparing for the installation of the ceiling slab 4 floors

103/15 (2) work on the installation of the ceiling of the 4th floor - 90% readiness

4th line

103/16 completed the brick masonry of the external and internal walls of the first floor of one building

103/18 (1) direct section - mounting of pounds. Blocks of basement floor executed on 80%,

103/18 (2) mounting pounds. Blocks of the ground floor executed on 60%.

Electroelectricity maintenance of the houses (external part), the arrangement of a metal fence along the route, and work on improvement are underway.