17.03.2017

Course of construction

2 Queue:

In the house 103/10 - provodjat shtukaturnыe work. Vыpolnyayutsya krovelnыe work. Installation Internal wiring. Obustroystvo entrance (Input part at home).

In the house 103/9 - Installation Internal wiring.

In the house 103/8 - Obustroystvo entrance (Input part at home).

3 Queue:

In the house 103/11 (Sections 1) Perekrыtye plates over 4 floor.

Home 103/11 (Sections 2) laying bricks 4 floor.

In the house 103/11 (3 Sections) 4 laying bricks floor.

Home 103/12 (Sections 1 and 2) - work on zakanchyvayut perekrыtyyu 3 floor plates. 3 Beginning masonry floor.

Home 103/13 (Sections 1) - 3 perekrыtye floor plates.

Home 103/13 (Sections 2) laying bricks 3 floor.

In the house 103/14 (Sections 1) - Laying bricks 3 floor.

In the house 103/15 (Sections 1) vedutsya work on perekrыtyyu 2 floor plates.

Home 103/15 (2 Sections) kyrpychnaya clutch 3 floor.

4 Queue:

Home 19 - Arrangement monolytnoho belt installation plates. Perekrыtye Podwale.

Home 16 - Installation fundamentnыh Podwale blocks.

Home 17 - Installation fundamentnыh Podwale blocks.

Home 18/1 - dismantling formwork foundation.

Home 18/2 - Arrangement of formwork foundation.