24.03.2017

Course of construction

2 turn:

The house 103/10 - are plastering works. Continue to conduct internal power supply. Performed roofing work also formed the installation of entrance (entrance of the house).

The building 103/8 and 103/9 - Construction of the entrance (entrance of the house). Conduct internal power supply.

3 turn:

The house 103/11 (1 section) - complete clutch 4 floors.

House 103/11 (2 sections) - complete clutch 4 floors. Transition to the stage floor slabs.

The house 103/11 (3 Section) - finish work on overlapping plates 4 floors.

House 103/12 (1 section) - started floors 3 floors. House 103/12 (2 sections) - complete clutch 4 floors.

House 103/13 (1 section) - End of masonry 3 floors.

House 103/13 (2 sections) overlapping end 3 floors.

The house 103/14 (1 section) - Bricklaying 3 floors.

The house 103/15 (1 section) - End of masonry 3 floors.

House 103/15 (2 sections) - start assembling 2 floors.

4 turn:

In the house 16 and 17 - performed works of the construction of the foundation.

House 18/1 - Arrangement of formwork foundation.

House 18/2 - Spend dismantling formwork foundation. House 19 - works underway basement slabs.